A
PEKERJAAN PERSIAPAN





A.1
Pembersihan & Perataan Lahan
SNI - 1.6
132.80
m2
7,725.00
1,025,880.00
A.2
Pek. Barak Kerja
-
1.00
Ls
350,000.00
350,000.00
A.3
Pengukuran & Pemasangan Bowplank
-
1.00
Ls
300,000.00
300,000.00
A.4
Pek. Papan Nama Proyek
-
1.00
Ls
250,000.00
250,000.00
A.5
Keselamatan & Kesehatan Kerja
-
1.00
Ls
400,000.00
400,000.00
A.6
Administrasi & Dokumentasi
-
1.00
Ls
350,000.00
350,000.00

Sub Total




2,675,880.00
B
PEKERJAAN KONSTRUKSI GREEN HOUSE





B.1
Pek. Galian Tanah Pondasi
SNI - 2.1
22.10
m3
20,580.00
454,818.00
B.2
Pek. Urugan Tanah Kembali
SNI - 2.9
8.21
m3
9,865.50
80,995.76
B.3
Pek. Pondasi Batu Gunung/Belah
SNI - 3.5
7.04
m3
621,636.24
4,376,319.13
B.4
Pek. Pas. Batu Kosong
SNI - 3.14
2.42
m3
332,192.70
803,906.33
B.5
Pek. Urugan Pasir di bawah Pondasi
SNI - 2.12
1.21
m3
209,125.80
253,042.22
B.6
Pek. Urugan Pasir di bawah Lantai
SNI - 2.12
4.14
m3
209,125.80
865,780.81
B.7
Pek. Urugan Sirtu di bawah Lantai
SNI - 2.17
8.27
m3
114,112.50
943,710.38
B.8
Pek. Rabat Beton camp. 1:3:5
SNI - 7.1
6.61
m3
808,791.54
5,346,112.08
B.9
Pek. Sloop 15/20






- Pek. Beton camp. 1:2:3
SNI - 7.5
1.32
m3
899,948.76
1,187,932.36

- Pek. Pembesian
SNI - 7.25
206.65
kg
11,293.88
2,333,879.27

- Pek. Bekisting
SNI - 7.31
6.60
m2
213,458.20
1,408,824.15
B.10
Pek. Kolom 15/15 camp. 1:2:3






- Pek. Beton camp. 1:2:3
SNI - 7.5
0.90
m3
899,948.76
809,953.88

- Pek. Pembesian
SNI - 7.25
179.52
kg
11,293.88
2,027,476.44

- Pek. Bekisting
SNI - 7.31
4.49
m2
213,458.20
958,427.34
B.11
Pek. Ringbalok 15/17 camp. 1:2:3






- Pek. Beton camp. 1:2:3
SNI - 7.5
1.13
m3
899,948.76
1,016,942.10

- Pek. Pembesian
SNI - 7.25
224.37
kg
11,293.88
2,534,006.73

- Pek. Bekisting
SNI - 7.31
5.61
m2
213,458.20
1,197,500.52
B.12
Pek. Talang PVC Segi Empat + Acc
SNI - 11.21
15.29
m'
28,820.63
440,667.36
B.13
Pek. Dinding Bata camp. 1:4
SNI - 4.11
48.10
m2
99,671.01
4,794,175.44
B.14
Pek. Plesteran camp. 1:5 t=15 mm
SNI - 5.5
99.76
m2
32,035.41
3,195,852.74
B.15
Pek. Acian PC
SNI - 5.13.b
99.76
m2
16,312.10
1,627,295.43
B.16
Pek. Rangka Atap Pipa Besi dia. 3/4"
SNI - 10.21
347.79
m'
25,109.00
8,732,659.11
B.17
Pek. Reng Atap dgn Pipa Besi dia. 5/8
-
140.04
m2
49,385.00
6,915,875.40
B.18
Pek. Pemasangan Kawat kasa Lapis Kawat Burung + Rangka
SNI - 11.14
57.87
m2
128,088.42
7,412,476.82
B.19
Pek. Pintu Kasa + Rangka Pipa Besi
-
2.00
unit
137,500.00
275,000.00
B.20
Pek. Atap PVC flat transparan
SNI - 8.38
140.04
m2
38,695.30
5,418,889.81
B.21
Pek. Pipa Vertikal Air Hujan 2,5 "
SNI - 10.30
14.50
m'
41,786.10
605,898.45
B.22
Pek. Pengecatan Tembok
SNI - 14.14
99.76
m2
13,995.00
1,396,141.20

Sub Total




67,414,559.25
C
PEKERJAAN AKHIR





C.1
As Built Drawing
-
1.00
Ls
600,000.00
600,000.00
C.2
Pembersihan Akhir
-
1.00
Ls
600,000.00
600,000.00

Sub Total